When a trench quote runs to five figures, a stand-alone solar and battery system can cost less, but only if it will actually start the compressor. Size it from the tools that might run together: add their running watts, then make sure the inverter’s surge rating covers the largest motor starting while everything else is running. For a Brisbane workshop with a table saw and a compressor, that usually means a system sized in kilowatts, not a 400W panel and a camping battery. This guide walks through solar panels for shed power the way we size them at Ecoelectric, so you can check our numbers against your own tools before you sign anything.
Is a stand-alone solar system cheaper than trenching to a shed?
Sometimes, but not automatically. A trench quote is shaped by distance, the ground and how many road or driveway crossings sit between the switchboard and the shed. A stand-alone system is shaped by the load you put on it. Compare the two quotes on the same basis: the trench quote against a system that will start your real tools and get through a poor week of bad weather.
For a rough baseline on the solar side, the Solar Choice Price Index for October 2026 lists installed grid-connected systems in Brisbane at $5,550 for 5kW and $9,460 for 10kW, after the STC discount and GST. Those are grid-tied prices with no battery, so they price the panels and inverter, not a shed system. A stand-alone system adds battery capacity, a larger inverter and the isolation and earthing work that a shed supply needs, so the real comparison is between your trench quote and a quote built from your load list.
Ask the trencher what ground conditions they assumed. A five-figure quote for a long run across rocky acreage ground is not unusual, and the cable is usually only one part of it. If the run is short, the ground is easy, or the shed already has a feed, trenching often wins. If the run is long and the ground is hard, a stand-alone system often wins, but only once its surge rating has been calculated properly.
What goes on the load list before you size anything?
Write down every tool and light you might run in the shed, and the hours each one runs per day. Include the things most first lists miss: the battery charger for the cordless tools, the dust extractor that runs with the saw, and any fridge or freezer. Then add the load you expect to add later, because a shed tends to collect tools.
For each item, take the running figure from the nameplate or the tool’s specification and the starting figure where it is given. Use the values in the table below as a structure to fill in, not as a list of ratings. Replace each placeholder with the figures printed on your own equipment.
| Item | Running watts (from plate) | Starting draw (from plate or spec) | Hours per day in use | Runs at the same time as |
|---|---|---|---|---|
| Table saw | Your figure | Your figure | Your figure | Lights, extractor |
| Air compressor | Your figure | Your figure | Your figure | Lights only |
| LED lighting | Your figure | Not applicable | Your figure | Everything |
| Battery chargers | Your figure | Not applicable | Your figure | Lights |
| Fridge (if fitted) | Your figure | Your figure | 24 hours | Everything |
Two rules keep the list honest. Do not size from nameplate watts alone, because a tool’s running draw can sit well below what it pulls when loaded or starting. And leave margin for what you will plug in later. A workshop that leaves a tool off the list is a common reason a system underperforms.
How do you work out the surge a compressor or table saw needs?
Motor-driven tools draw several times their running current when they start. A compressor or saw motor can pull a short, heavy burst on start-up that is far larger than its steady running draw, and an inverter has to deliver that burst or the tool will fail to start, trip the inverter, or stall. The starting figure is the number that decides the inverter, not the running figure.
Work it out this way:
- Find the starting figure for each motor. Check the nameplate, the motor data plate and the tool’s starting or inrush rating in the manual. Where only a running figure is printed, treat the starting figure as several times that value and confirm it with the manufacturer before you rely on it.
- Identify the largest motor, the one with the biggest starting draw. That is the one that will be starting at the worst moment.
- Add the running draw of everything else that might be on at the same time as that motor starts. Anything already running counts here, because it is drawing power when the motor kicks in.
- Make the inverter’s surge rating cover that total. Size the surge capacity to the largest motor starting while the others run, not the sum of every tool in the shed.
- Stagger the starts where you can. Starting the compressor only when the saw is idle lowers the peak the inverter has to meet, and it is cheaper than buying a larger inverter.
If you cannot find a starting figure for a tool, ask the manufacturer or the installer to confirm it in writing before you size the system around it. A sizing decision built on a guessed surge figure is a common reason a stand-alone shed system struggles once it is installed.
Does a shed inverter need pure sine wave output, and what stays on mains?
Pure sine wave output matters for electronics and variable-speed tools, which include many modern drills and some compressors. Modified sine wave can run simple heaters and globe lights, but it can make sensitive equipment run hot, buzz or behave badly. For a workshop with mixed tools, plan for pure sine wave output unless every tool on your list is confirmed to tolerate modified sine.
Some loads should stay on the mains supply or be left out of an off-grid shed plan. Welders are the first of these. Their short, heavy draws can exceed what a reasonable shed system will deliver, and a welder that drops the inverter partway through a weld is both a safety problem and a waste of an expensive system. Large heaters, kilns and induction cooktops are in the same category. A stand-alone shed system will not produce or store enough energy to run them safely or consistently, so they belong on mains or outside the plan. If your workshop relies on any of these, a split arrangement is often better: solar and battery for the lights, chargers and hand tools, and mains for the rest.
Our 8kW Victron inverter is one option for a workshop with mixed loads. Its listing is on the Victron 8kW Multiplus island inverter page, and we will confirm whether it fits your surge figure once you give us the load list. If you simply must have welders or other large tools, then larger options 30kW of higher are available.
How many poor days in a row should the battery ride through?
Size the battery by days of autonomy rather than hours of use. The question is how many poor days in a row you want to get through without topping the battery up from the grid or running a generator. In South East Queensland the test is storm-season overcast, not winter, because summer is when the sun is strong on good days and storm fronts can run for several days in a row.
For a workshop used on weekends only, a modest battery is often enough, because the daily energy demand is low and the system has plenty of time to recharge. A shed you work in every day needs far more storage, and that is where the cost goes up. Overbuying storage for weekend use is an expensive mistake, so start from your real usage pattern, not from the largest battery you can afford.
Work it out this way. Take your daily energy use from the load list. Multiply it by the number of poor days you want to cover, say two or three in summer. Then check the usable capacity on the battery datasheet, not the nominal capacity on the front. Usable capacity is the number that counts. Plan with lithium batteries; they handle the daily cycling and depth of discharge a workshop puts on them better than most lead-acid options, though placement matters, as covered in the next section. Our BYD 2.76kWh battery module page lists the specifications for one common option.
Accept the limit. A system sized for two or three poor days will not run heavy tools through a storm. If you need that, the honest answer is a larger battery, a generator or mains backup, not a promise the system cannot keep.
Where should the battery go in an uninsulated steel shed?
This is where many shed installations go wrong. Lithium batteries lose performance, derate or shut down when they get hot, and an uninsulated steel shed in a Queensland summer is one of the harshest spots on a property for one. Roof temperatures under steel sheeting can climb well past what the battery is designed to tolerate, and the air inside can stay hot after dark.
Mount the battery in a shaded, ventilated position, away from the roof and away from any wall that takes afternoon sun. Keep it off the floor if the shed floods, and allow clear airflow around the cabinet. Check the manufacturer’s operating temperature range in the datasheet rather than guessing, and compare it against the temperatures you expect in your shed on the hottest days. If the shed cannot meet that range, a cooler location, such as a shaded spot in a separate room or a cabinet on the house side of the block, is a better choice than the shed.
Ventilation matters for the inverter and the modules too. Sustained summer heat puts real thermal stress on electronics, so keep the inverter clear of heat sources and out of direct sun where you can. Our practical view is that battery placement is a design decision, not an afterthought, and it should be made before the shed is wired.
How many panels does the workshop need once the daily energy is known?
The array size comes from the daily energy you need, divided by the usable sun you can count on after system losses. Work through it step by step with example values, then replace them with your own.
- Total the daily energy from the load list. Example only: a compressor running 1 hour a day at 2kW is 2kWh, a saw running 30 minutes at 1.8kW is 0.9kWh, lights for 6 hours at 0.1kW are 0.6kWh, and chargers add 0.5kWh. The example total is about 4kWh a day. Replace these figures with the values from your own tally.
- Add a margin for the battery and inverter losses that happen between the panels and the tools. Take the daily energy as the amount the battery must deliver, then size the array to refill the battery as well as run the load on a good day.
- Divide by the usable sun hours you expect in your location after system losses. Peak sun hour figures for South East Queensland have to come from a named source before they go into any sizing decision; do not use a figure from memory or from a competitor’s page.
- Check the result against a poor-day test. An array that works on a clear day but cannot refill the battery in two or three overcast days is undersized for the storm season, and you should add panels or accept the limit.
- Confirm the answer with the installer in writing. Ask for the load tally they used and the sun-hour figure they assumed. If they sized from roof area or the number of panels they could fit instead of your actual tools, get a second opinion.
The result for a workshop with a compressor and table saw is usually in kilowatts of panels, not the 400W of a light-use kit. A 400W panel is a fine answer for a shed that runs lights, a phone charger and a small fridge. It is not an answer for a workshop that runs a saw and a compressor. The worked example above is a method, not a quote; the real figure depends on your tools, your hours and your roof or ground space.
If your block suits a pre-engineered package, our 5kW off-grid system with Victron and BYD is one starting point to test your load list against. We will tell you honestly if the numbers point to a larger system or a different approach.
Can the shed roof carry the array, or should it be ground mounted?
Start with the roof structure. This is a go or no-go question. An installer should decline a roof mount if the roof is unsafe to access or cannot carry the array. That includes asbestos sheeting, brittle or heavily rusted roofing, unsafe ladder points, and an unstable footing or slope. A shed roof that looks sound from the ground can still fail that test once someone is standing on it with a frame and panels, so get the structure checked before you plan around the roof.
If the roof fails, ground mounting is the fallback. It adds the cost of frames and some trenching or cabling, but it avoids loading the shed and keeps the array at a height you can reach. Ground mounting also makes it easier to clean the panels and to keep wildlife out. On a treed acreage block, nesting animals are a real issue under any array, so consider a protective mesh for the panels as part of the install. Our solar vermin proofing and possum guard service covers that job. For the wider maintenance picture, the solar panel maintenance guide explains what to inspect from the ground and when to call a technician.
Shade is the quiet failure if there are trees. A shed under large trees, in a gully or on the southern side of a slope may not generate what the sizing assumes, and no amount of extra panels fixes a shaded roof. Check the sun path at different times of year before you commit to a roof position, and consider ground mounting on an open part of the block if the shed sits in shade.
What must a licensed electrician check before the shed is switched on?
A stand-alone outbuilding supply is an electrical installation in its own right. Its earthing, isolation and main switch sit under AS/NZS 3000, the Wiring Rules, and the solar side sits under AS/NZS 5033. Those standards cover cable protection, isolator placement, earthing and fire safety, and they are not something to leave to a weekend job. Have a licensed electrical contractor install and test the earth electrode, the isolation point and the main switch before the system is energised.
Use this checklist with the installer before you accept the job:
- The earth electrode is installed and tested, and the earthing arrangement for the shed supply is documented.
- A clearly labelled isolation point is in place where anyone working on the shed can switch the supply off safely.
- The main switch and protection devices are sized for the load tally, not for the panels alone.
- The DC side has isolators at the array and battery, and they are accessible without climbing the roof.
- The battery and inverter are mounted in the position you agreed, with ventilation and temperature in mind.
- The compliance paperwork and the load tally are supplied in writing.
Ecoelectric is a Licensed Electrical Contractor and a Fronius Service Partner, and we can take a stand-alone shed system from the load list through to commissioning. A stand-alone system sits outside the grid-connection framework that Energex applies to grid-tied installations, so the work here is about the shed supply and the off-grid design, not an export application. If you want a pre-engineered package, start from the off-grid solar systems range. If your workshop is more demanding, or you want the load list checked before you spend anything, request a custom workshop sizing assessment through the contact page or call 07 33766409. For a pre-summer check of any existing solar on the property, our solar safety checks are a good place to start.
Frequently asked questions
How many solar panels do I need to power a shed?
There is no single count. It comes from the daily energy of the tools and lights, divided by the usable sun hours after system losses. A workshop with a compressor and table saw lands in kilowatts of panels, not the 400W of a light-use kit. The worked example in the sizing section shows the arithmetic.
Can I power a shed with solar?
Yes, for lights, chargers and hand tools at small scale. Compressors and saws need an inverter whose surge rating covers the largest motor starting, and enough battery for the poor days you expect. Welders and large heaters usually stay on mains or out of the plan.
Will a 400W solar panel run a fridge?
A 400W panel can run a small efficient fridge in good sun with enough battery storage, but not a fridge plus workshop tools. The fridge runs all day, so its daily energy goes into the load tally first.
What is the easiest way to add electrical power to a shed?
It depends on distance and load. A short run to lights and a charger is usually a trench or a sub-board. A long run to a heavy workshop is often a stand-alone system, but only once its surge rating has been calculated.
Does a stand-alone shed solar system earn a feed-in tariff?
No. A system with no grid connection has nothing to export, so a feed-in tariff does not apply to it. Queensland has no minimum or premium feed-in tariff mandated, and the grid-connected plans compared on Canstar in October 2026 were all variable-rate.