20kW Solar System: Size, Roof Area and Commercial Costs

A crane lifting a pallet of supplies over a rooftop overlooking the Brisbane skyline.

A 20kW solar system suits a Brisbane business that uses plenty of power while the sun is up. Plan on about 46 panels at 440W, roughly 100 to 110 square metres of usable roof and a three-phase supply. Whether it pays depends on your own meter data and the export arrangements your network operator approves.

Why start with twelve months of meter data?

Why start with twelve months of meter data?, Ecoelectric

Start with electricity use, not panel count. The Australian Government’s energy.gov.au guidance says smart meters record usage every 15 or 30 minutes. Request twelve months of interval data from your distribution network service provider to see how much power your business uses while the sun is up.

A workshop running through the day can use solar power as it is generated. A building closed on weekends may export much of that output at a lower value. Match the data to your trading hours; our commercial solar payback guide explains the financial drivers.

How much roof does a 20kW array need?

Aerial view of an industrial warehouse roof installed with large commercial solar panel arrays.

Divide 20,000 watts by the panel rating, then round up to a whole panel. Roof area needs a separate calculation using the quoted panel’s actual dimensions. Higher-wattage panels are not necessarily the same physical size.

Panel ratingPanels needed to reach at least 20kWTotal array rating
400W5020kW
440W4620.24kW
500W4020kW
550W3720.35kW

At roughly 2 square metres per 440W panel, 46 panels occupy about 92 square metres before access space. Allowing 100 to 110 square metres is a reasonable early planning figure, not a roof design. Skylights and rooftop equipment can reduce the usable area considerably.

Is the switchboard ready for three-phase and the inverter?

Open electrical switchboard with wired circuit breakers and a smart meter.

Check the switchboard before committing to the roof layout. At this size, expect to need three-phase supply, subject to the distributor’s requirements. An older board may need replacing, and that cost should appear separately on the quote.

Inverter location also needs attention. Heat can reduce output, so a Brisbane installation needs suitable ventilation rather than whatever wall space happens to be available.

What a switchboard inspection checks

A licensed electrical contractor should establish whether the existing board can safely accommodate the installation. The inspection covers five points:

  1. Supply capacity and whether the connection is three-phase.
  2. Earthing continuity and existing protection devices.
  3. Space for the additional electrical equipment.
  4. Damaged connections or signs of water ingress.
  5. Whether the board needs extending or replacing.

Where the inverter goes in a Brisbane summer

Follow the manufacturer’s ventilation clearances and location requirements. Avoid a hot, enclosed space, and provide protection from direct sun where specified. Leave enough access for servicing without having to dismantle surrounding equipment.

What does a commercial 20kW system cost installed?

A September 2025 Australian price guide gives an indicative range of $22,000 to $30,000, depending on equipment and installation complexity. That is not a current Brisbane commercial quote, and it does not establish what your site work or rebate treatment will include.

Commercial pricing needs a site inspection. A switchboard replacement can change the total substantially; a low headline price means little until those requirements are costed.

What the published range does not cover

A broad price range cannot tell you whether your roof needs repairs or your connection needs export control. Ask the proposal to state what is included and what remains provisional. Do not assume a published package price includes every commercial installation requirement.

How the rebate should appear on the quote

Ask for the Small-scale Technology Certificate discount as a separate line, with the calculation and certificate value stated. The deeming period reduces each year as the scheme approaches its end in 2030.

Energy.gov.au’s sizing guidance also warns that panel capacity exceeding the inverter manufacturer’s specifications can make a system ineligible for the scheme. A smaller inverter is not automatically a problem; exceeding its permitted design limits is.

What does Energex require for a 20kW connection?

For a Brisbane site on the Energex network, confirm the connection requirements for the proposed inverter capacity before signing. Panel capacity alone does not establish the approval pathway or how much electricity you can export.

Get the site-specific answers in writing:

  1. Which connection pathway applies to this inverter size?
  2. Who prepares and lodges the application?
  3. What export limit will apply?
  4. When can the system be connected and energised?

What does payback look like for a business that trades in daylight?

Annual generation divided by an annual electricity bill is not a payback calculation. The model must value the power you use separately from the power you export.

  1. Model generation for the site. Use roof orientation and shading, not just array capacity. The Australian Government’s energy.gov.au website points to SunSPOT, a free, not-for-profit calculator that estimates generation-related savings and payback for homes and small businesses.
  2. Match generation to interval data. Include weekends and shutdown periods, not just a typical trading day.
  3. Apply the right electricity rates. On-site use avoids electricity purchases. Exports earn the applicable feed-in tariff. Fixed charges usually stay the same.
  4. Work out the annual savings. Account for export restrictions and any tariff charges the system will not reduce.
  5. Work out the simple payback. Divide the net installed cost by annual savings, with the assumptions shown beside the result.

If you lease the building, obtain written landlord consent and establish who owns the system. A payback period longer than your secure lease term needs careful consideration.

Should the tax write-off change the decision?

Ask your accountant whether the system must be depreciated or qualifies for a deduction under the rules applying to your business that financial year. Do not build an assumed write-off into your cash flow before checking eligibility.

A tax benefit cannot fix a system that produces most of its power when the building is empty.

What should a commercial quote show before you sign?

A useful proposal shows how the design fits your site. Look for these eight points:

  • Savings should be built on your own meter data and reflect your operating hours.
  • The switchboard findings should be listed, with any upgrade costed separately.
  • Export arrangements should be spelled out, and the model should account for low-use days.
  • Generation assumptions should include shading and seasonal variation.
  • Itemised site work should identify costs beyond the panels and inverter.
  • The certificate discount should appear as a separate line from the installation price.
  • Payback workings should show the tariffs and on-site consumption assumptions.
  • Roof condition should be assessed, because replacing worn sheeting before installation can avoid removing panels later.

Get a second opinion if the proposal skips the switchboard inspection or leaves export arrangements unresolved. Premium equipment is not the cheapest option, but equipment price alone says little about the finished installation’s reliability.

Arrange a site assessment before accepting a final price

A satellite image cannot establish roof condition or switchboard capacity. Those need an on-site inspection before a final design and price are agreed.

Ecoelectric is a licensed electrical contractor providing commercial and industrial solar design and installation in Brisbane. To discuss your site, call 07 33766409 or use the contact page, with twelve months of meter data if available. Our commercial solar page covers the service.

Frequently asked questions

How many solar panels does a 20kW system need?

You need 46 panels at 440W, 40 at 500W or 37 at 550W to reach at least 20kW. For 440W panels, allow roughly 100 to 110 square metres as an initial roof-space estimate. Confirm the final area using the selected panel dimensions and access requirements.

Does a 20kW system need a three-phase connection?

At this size, expect to need three-phase supply. Confirm the requirement and permitted inverter capacity with Energex or your distributor before committing to the installation.

What is the payback period for a 20kW commercial solar system in Queensland?

There is no reliable single payback period without the site’s electricity data and installed cost. Calculate annual savings from on-site solar use and permitted exports, then divide the net cost by those savings. Our commercial payback guide explains the main variables.

Can a 20kW commercial system earn the federal certificate rebate?

A qualifying 20kW installation can receive Small-scale Technology Certificates, subject to the scheme’s eligibility requirements. The discount depends on factors including location and installation year. Ask for it separately on the quote and confirm that the equipment and design meet the scheme’s requirements.

Can a business write off a 20kW solar system this year?

Eligibility depends on the business and the tax rules applying in the relevant financial year. Confirm the treatment with your accountant or the ATO before relying on a deduction in your purchasing decision.